This is another view of the turbine during re-assembly. from the right is the turning gear assembly, then the low pressure section (black) and then the high pressure section casing. The three upper steam inlet control valves are located on the top of the high pressure casing. Not shown are three more steam inlet control valves are located on the bottom of the turbine.