In addition to the three steam units at Burdick Station, there are three combustion turbines as well.  the combined generating capacity all three combustion turbines is 95 megawatts.  Shown to the left is GT-1.  It has a rated generating capacity of 14 megawatts. 
Shown to the left are GT-2 and GT-3.  Each unit is rated for 40 megawatts each.  They were built in 2002 and placed into commercial operation in 2003. 
All three combustion gas turbine units feature the latest PC based General Electric Mark V turbine - generator supervisory and control system. 